{"id":157370,"date":"2026-07-19T15:46:25","date_gmt":"2026-07-19T22:46:25","guid":{"rendered":"https:\/\/www.lankaweb.com\/news\/items\/?p=157370"},"modified":"2026-07-19T15:46:25","modified_gmt":"2026-07-19T22:46:25","slug":"another-project-on-qatar-where-ex-cpc-sri-lankan-professionals-are-working","status":"publish","type":"post","link":"https:\/\/www.lankaweb.com\/news\/items\/2026\/07\/19\/another-project-on-qatar-where-ex-cpc-sri-lankan-professionals-are-working\/","title":{"rendered":"Another project on Qatar where ex CPC Sri Lankan professionals are working\u00a0"},"content":{"rendered":"<h2><span style=\"color: #0000ff;\"><em>Dr Sarath Obeysekera\u00a0<\/em><\/span><\/h2>\n\n\n<h2 class=\"wp-block-heading\">Al-Shaheen Field Expansion Project, Qatar<\/h2>\n\n\n\n<p>The project I am&nbsp;referring to is the <strong>Ru\u2019ya Development Project<\/strong>, a major expansion of Qatar\u2019s offshore <strong>Al-Shaheen oilfield<\/strong>, operated by <strong>North Oil Company<\/strong>, a joint venture between QatarEnergy and TotalEnergies.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Central Processing Platform<\/h3>\n\n\n\n<p>One of the largest packages covers a new <strong>Central Processing Platform complex<\/strong>. The approximately <strong>US$1.9 billion EPCIC contract<\/strong> was awarded to a consortium of <strong>McDermott Middle East and Hyundai Heavy Industries<\/strong>.<\/p>\n\n\n\n<p>5<\/p>\n\n\n\n<p>The package reportedly includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A new central processing platform topside and jacket<\/li>\n\n\n\n<li>Oil, gas and produced-water processing systems<\/li>\n\n\n\n<li>Utility and power-generation facilities<\/li>\n\n\n\n<li>Accommodation and control facilities<\/li>\n\n\n\n<li>Bridges connecting the central platform to associated offshore structures<\/li>\n\n\n\n<li>Flare and supporting facilities<\/li>\n\n\n\n<li>Offshore transportation, installation, hook-up and commissioning<\/li>\n<\/ul>\n\n\n\n<p>The central processing platform will receive production from the new wellhead platforms, separate and treat the oil, gas and produced water, and transfer the processed crude into the field\u2019s existing export and storage system.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">McDermott\u2019s scope<\/h3>\n\n\n\n<p>McDermott received major Ru\u2019ya packages covering offshore engineering, procurement, construction, installation and commissioning. Its wider scope includes several new wellhead platforms, jackets, pipelines, subsea cables and associated modifications to existing facilities.<\/p>\n\n\n\n<p>Some of the fabrication and engineering work is being distributed among McDermott-associated and subcontracted Asian yards because the Ru\u2019ya programme involves very large quantities of structural steel and multiple offshore structures.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Jackets fabricated in China<\/h3>\n\n\n\n<p>Chinese yards have secured important fabrication work for the project.<\/p>\n\n\n\n<p><strong>Chiwan Sembawang Engineering<\/strong>, commonly known as CSE, received a subcontract from McDermott to fabricate an offshore platform jacket for the Ru\u2019ya development. The work began at its fabrication facilities in China.&nbsp;<\/p>\n\n\n\n<p>Additional jackets and foundation piles were fabricated at a yard in <strong>Qingdao, China<\/strong>, and delivered to McDermott. These structures form the steel substructures fixed to the seabed upon which the wellhead or processing-platform topsides are installed.&nbsp;<\/p>\n\n\n\n<p><strong>The jackets typically require:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Large-diameter tubular steel members<\/strong><\/li>\n\n\n\n<li><strong>Heavy node fabrication<\/strong><\/li>\n\n\n\n<li><strong>Full-penetration welding<\/strong><\/li>\n\n\n\n<li><strong>Dimensional-control surveying<\/strong><\/li>\n\n\n\n<li><strong>Non-destructive testing<\/strong><\/li>\n\n\n\n<li><strong>Corrosion protection and anodes<\/strong><\/li>\n\n\n\n<li><strong>Pile sleeves, conductors and boat landings<\/strong><\/li>\n\n\n\n<li><strong>Load-out using skid beams or self-propelled modular transporters<\/strong><\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Saipem\u2019s role<\/h3>\n\n\n\n<p>&nbsp;was also awarded major work connected with the Al-Shaheen expansion, although its package is separate from the McDermott\u2013Hyundai central processing platform contract.<\/p>\n\n\n\n<p>Saipem\u2019s responsibilities are understood to cover offshore facilities such as wellhead platforms, jackets, subsea pipelines, cables, installation and modifications to existing offshore infrastructure. The exact division of fabrication among Saipem\u2019s own yards and Asian subcontractors varies by package.<\/p>\n\n\n\n<p>Saipem has substantial fabrication capacity at its <strong>Karimun yard in Indonesia<\/strong>, while McDermott uses its Batam and Qatar fabrication facilities and subcontracts selected structures to Chinese yards.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Overall Ru\u2019ya development<\/h3>\n\n\n\n<p>The Ru\u2019ya programme comprises several major EPC packages valued collectively at approximately <strong>US$6 billion<\/strong>, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Nine new wellhead platforms and jackets<\/li>\n\n\n\n<li>A central processing platform complex<\/li>\n\n\n\n<li>A riser platform<\/li>\n\n\n\n<li>Hundreds of kilometres of subsea pipelines and cables<\/li>\n\n\n\n<li>Brownfield modifications to existing platforms<\/li>\n\n\n\n<li>Offshore installation, hook-up and commissioning<\/li>\n<\/ul>\n\n\n\n<p>The expansion is intended to increase Al-Shaheen production by about <strong>100,000 barrels per day<\/strong>, with additional output expected around 2027.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Lesson for Sri Lanka<\/h3>\n\n\n\n<p><strong>This project demonstrates that offshore development work is internationally distributed. Qatar owns and operates the resource, international companies such as McDermott and Saipem undertake EPCIC responsibility, while large jackets and modules are fabricated in China, South Korea, Indonesia and other competitive Asian yards.<\/strong><\/p>\n\n\n\n<p><strong>Sri Lanka could participate in this supply chain by developing Trincomalee for:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Jacket and module fabrication<\/strong><\/li>\n\n\n\n<li><strong>Secondary steel and boat landings<\/strong><\/li>\n\n\n\n<li><strong>Piles and tubular structures<\/strong><\/li>\n\n\n\n<li><strong>Pipe spools and subsea structures<\/strong><\/li>\n\n\n\n<li><strong>Offshore-platform refurbishment<\/strong><\/li>\n\n\n\n<li><strong>Rig lay-up and repair<\/strong><\/li>\n\n\n\n<li><strong>Skilled welding and fabrication training<\/strong><\/li>\n\n\n\n<li><strong>Engineering and project-management support<\/strong><\/li>\n<\/ul>\n\n\n\n<p><strong>The principal requirement is a properly equipped offshore fabrication base, deep-water load-out facilities, skilled workers and a government-backed one-stop approval mechanism.<\/strong> Regards<br><br><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dr Sarath Obeysekera\u00a0 Al-Shaheen Field Expansion Project, Qatar The project I am&nbsp;referring to is the Ru\u2019ya Development Project, a major expansion of Qatar\u2019s offshore Al-Shaheen oilfield, operated by North Oil Company, a joint venture between QatarEnergy and TotalEnergies. Central Processing Platform One of the largest packages covers a new Central Processing Platform complex. The approximately [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[116],"tags":[],"class_list":["post-157370","post","type-post","status-publish","format-standard","hentry","category-dr-sarath-obeysekera"],"_links":{"self":[{"href":"https:\/\/www.lankaweb.com\/news\/items\/wp-json\/wp\/v2\/posts\/157370","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lankaweb.com\/news\/items\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lankaweb.com\/news\/items\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lankaweb.com\/news\/items\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lankaweb.com\/news\/items\/wp-json\/wp\/v2\/comments?post=157370"}],"version-history":[{"count":1,"href":"https:\/\/www.lankaweb.com\/news\/items\/wp-json\/wp\/v2\/posts\/157370\/revisions"}],"predecessor-version":[{"id":157371,"href":"https:\/\/www.lankaweb.com\/news\/items\/wp-json\/wp\/v2\/posts\/157370\/revisions\/157371"}],"wp:attachment":[{"href":"https:\/\/www.lankaweb.com\/news\/items\/wp-json\/wp\/v2\/media?parent=157370"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lankaweb.com\/news\/items\/wp-json\/wp\/v2\/categories?post=157370"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lankaweb.com\/news\/items\/wp-json\/wp\/v2\/tags?post=157370"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}